San Benito Smart Park

San Benito Smart Park is 2 MW wholesale generation facility in Hollister California. This System is over 8,800 modules and has had a positive effect on the local power grid, which was previously prove to blackouts and power surges as a result of being the end of the transmission line. This project was sold by the ASU Founder to Talesun / Enerpac.

The members of ASU developed the project providing the PG&E Wholesale Power Purchase Agreement, Entitlements and Permits, Interconnection, Design and Engineering for this project along with crucial mitigations for the projects success.

View San Benito Smart Park's Current Production

TC Ranch

The TC Ranch project is an 80 kW system located on an alfalfa farm and cattle ranch in the far reaches of Northern California, in the high desert, nearly on the Oregon Border. This system was implemented to offset the electrical usage of a large pump irrigating the alfalfa fields.

ASC built this Ranch Well Pump PV Solar System.

View TC Ranch's Current Production

Indianapolis Airport

The Indianapolis Airport project Phase I: 12 MW, comprised of 44,000 modules. The project is a wholesale generation project, and helping Indianapolis Power and Light increase the sustainability of their generation portfolio. Phase II: 10 MW 36,000 module and Phase III 2.5 MW 9,000 module.

ASU's members worked on and continue to work with Telamon and GES on these and other projects around the USA. ASU's members provided legal, financial, and design assistance to the project.

View Indianapolis Airport's Current Production

Iowa Solar Farm

The Iowa Solar Farm project is a 2 MW Project is currently under construction, and was designed to provide green energy to the community.

ASU has been a part of the projects development effort in conjunction with RER Energy Group and GES.

Iowa's Production Available Soon

Zamora

Zamora is an 812 kW project located on Interstate 505 two miles southwest of the I-505, I-5 interchange. Zamora is located in a sheep grazing pasture, and will be in continued grazing usage after construction. Zamora is currently under development in the permitting process. Zamora is slated to enter CEQA in two weeks time.

Zamora is being jointly developed between ASU and American Solar Construction.

Zamora Production Available Soon